California Field Tests Find About 96% of Public EV Chargers Working

A California Energy Commission report on 16,157 public charging ports found 96.2% of Level 2 and 96.4% of fast chargers working; card payments often failed.

Electric Vehicles

Written by:

About 96% of public EV charging ports in California were working when field testers checked them between January 2024 and February 2026, according to a California Energy Commission (CEC) staff report published in November 2026. The tests also found that first payment attempts failed 17.7% of the time.

Key points

  • Testers reached 16,157 publicly accessible charging ports and plugged a car into 3,571 of them between January 2024 and February 2026.
  • 96.2% of Level 2 ports and 96.4% of DC fast-charging ports were operational at the time of testing.
  • When a port was operational, an EV charged successfully in 93.1% of Level 2 tests and 94.0% of DC fast-charging tests.
  • First payment attempts failed 17.7% of the time overall and 34.4% of the time with a credit or debit card.
  • CEC staff plan to begin collecting time-series charger data in late 2026 for the first official uptime assessment, under rules that took effect on April 1, 2026.

How California tested its EV chargers

The field work was done for the CEC by the UC Davis Electric Vehicle Research Center under Assembly Bill 2061, a 2022 state law that requires the commission to assess charger uptime. Testers tried to reach 10,027 Level 2 and 8,320 fast-charging ports and were able to access 8,452 Level 2 and 7,705 DC fast-charging ports. They plugged a vehicle into 1,817 Level 2 and 1,754 fast-charging ports and only observed the rest.

The report uses two measures. The operational rate is the share of ports that worked at the moment of the visit. The successful charge attempt rate is the share of plug-in tests in which a car actually charged, among ports that otherwise appeared to work. Ports the testers could not reach were left out of the reliability numbers.

Measure Level 2 DC fast charging
Operational rate 96.2% 96.4%
Successful charge attempt rate 93.1% 94.0%
Largest network: operational rate 97.0% 99.6%
All other networks: operational rate 94.9% 92.1%
Largest network: successful charges 96.5% 98.3%
All other networks: successful charges 85.6% 89.7%

Results in disadvantaged and low-income communities differed from other areas by 0.3 to 1.2 percentage points, and rural and urban results by 0.1 to 0.8 points, which the report says is within the margin of error at 99% confidence. The report does not name the largest network.

Where charging failed

The authors say failed sessions most often came from communication problems between the car and the charger, or from payment systems. Credit and debit cards were the least reliable way to pay, failing on the first try 34.4% of the time; tapping a card was more reliable than chip or swipe. Plug-in payment, such as Plug & Charge or Tesla Supercharging, failed 2.3% of the time, and apps, membership cards and QR codes failed 14.0% of the time. The report notes the plug-in payment result was dominated by one closed network and may not apply to others.

Testers also found that nearly 9% of Level 2 ports and 7% of fast-charging ports were obstructed, for example by construction, dumpsters or combustion-engine vehicles.

Why it matters

An earlier study found a worse result. The report cites a 2022 UC Berkeley study of Bay Area fast chargers that found a 72.5% successful charge rate, while noting that different methods make direct comparisons difficult. The CEC staff authors write that the reliability of California’s public network “may have measurably improved in recent years.”

The scale is large: according to the report, California had more than 216,000 public and limited-access charging ports and more than 2.6 million EVs sold through 2025. The report notes that these point-in-time tests cannot be used to calculate uptime. For a sense of what a working session looks like at each charger level, see our guide to how long it takes to charge an electric car.

What’s next

Under California’s EV Charger Data and Reliability Standards, publicly funded fast chargers installed on or after January 1, 2024, that are not used only by fleets must meet a 97% uptime standard, with certain exclusions. The report says CEC staff will begin collecting time-series data in late 2026, which will be the basis for the first official uptime assessment; initial data submissions are expected near the end of 2026. The CEC’s standards page says it may publish reports ranking charging networks by reliability.

Sources

We send one email a week. No spam. Unsubscribe anytime. See our Privacy Policy.